What is the density of Cement, Fly ash,20 mm aggregate, 10
mm aggregate and stone dust?

Answer Posted / ashok panchal

Cement density 1428 kg/m cube
20 MM density 1800kg/ m cube

Is This Answer Correct ?    15 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we use aggregate,sand with cement in concrete?

8132


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1603


What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2252


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1069


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1662






What is Refuse Area In High Rise Building ?

1500


Explain the Strength of brick?

663


What is construction mitigation management?

1841


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1782


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3322


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

1898


what is the function of GSB all class ?

684


what is the basic difference between Coloumn & Shear Wall

1690


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1646


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.