What is the calculation for finding cement and sand for 10' * 12' area ratio 1:6 thickness 12 mm

Answer Posted / raghavan

0.019m3 of cement,0.12m3 of sand

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

1550


What is diversion tunnel in a dam?

694


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1022


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1964


what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?

2037






Where is the worlds longest elevator and how long is it?

694


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2101


Can inverted beams used in pipes during construction?

870


How to calculate steel for beam slab and column

1366


what is raft foundation

1139


How to find out kg per Sft ?

1805


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1466


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1523


Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......

1731


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2041