difference between specification and method of statement

Answer Posted / john

Hello my name in John I'm an architectural engineer with more than 3 years of experience in engineering field.. I hope this will help.

specification making depends on what specifications your going to specify.

like for example ill make specifications regarding architectural work, you will just usually specify your materials and scope of work.. see sample below.

1. Doors - should be painted green and have a dimension of 2100mm x 900mm they should be 50mm THK. and have stainless steel handles. Door frames should be painted green to match with the door leaf.

2. Windows - should be 900x1200mm wide, the window frames should be tubular and powder coated and to be painted green to match with the doors.

3. Ceiling - height should be 2400mm from the floor finish, the ceiling should be 6mm thk. fiber cement board. to be painted green to match with the doors.

4. floor – will be covered with 600x600x6mm thk. Floor tiles, color to match with door.

etc....

While in method statement you should specify the instruction or the step by step procedure in construction..

e.g. Lets say you'll make an architectural method statement.. see sample below..

step 1. Before any architectural works can begin the site engineer will make sure all structural works should be completed first..
step 2. after the structural is finished install all supporting systems required by MEP. Structural engineer to supervise site installation..
step 3. Create all necessary wall opening and clean them with (whatever the subcontractors proposal) so that dust other vermin cant compromise the integrity of the openings.
step 4. Install all doors and windows as per the suppliers specifications. (usually attachment of catalogue is inserted).
Step 5. Install all ceiling and necessary supports required make sure that the connections are complying with building codes etc…
Step6. Before installing floors make sure that the floor have the minimum amount of dust/vermin then apply a water proofing paint all over the wet area after provide a 20mm thk. Setting concrete, and layout the tiles accordingly.
Step 7. Install blah blah blah blahh......... with supervision of site engineer blah blah blah…

I hope this samples will help you understand better..

Please note that these are just samples. Writing specifications and method statements are much more complicated than what I have shown above, these are just simplified versions, to be able to write them properly you need to have a lot of site (construction) experiences + knowledge in handling and installation of materials..

Is This Answer Correct ?    12 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

.5Ast

1346


Slab quantity 

1607


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1661


what will happen if one could not properly follow the spacing of slab reinforcement bar?

1574


how i can tak Quantity of mortar in block work

1986






How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1369


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2411


difference between fc and fc'?

1312


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1044


how to conversation of all construction material in to brass

4705


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2059


What is the withdrawal force of steel nails?

674


what course did you consider thinking before you enrolled in college?

1920


i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI

1884


What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?

1011