advantages & disadvantages of using crusher dust instead of
sand in r.c.c work
Answer Posted / islam sami
the question should give us more details like FM of this dust ,absorption and material finner than 200 micron but any way
in case of FM is 2.5 % as example
the advantage using low water cement ratio and less percentage of chemical admixture at concrete mix
hing durability concrete performance specially dry shrinkage
the disadvantage of using crushed rock or gravel are
bleeding of concrete cause of less absorption
harsh concrete due to surface texture of it's particle
high air content of the concrete
lowest strengths at early ages
the question is wide cases so it maybe have a lot of answers
| Is This Answer Correct ? | 0 Yes | 7 No |
Post New Answer View All Answers
what course did you consider thinking before you enrolled in college?
how to stop beam concrete between column
Which architectural movement is also known as jazz moderna?
What are the methods of measurement? Describe it shortly
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
what is the composition of good brick ?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
What is the procedure of concealed plumbing in toilets?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
how many cement used in single story residential building per sqft
I need to constructive work in amaraj batteries
Rate analysis of Vitrified tile in cement mortor 1:3
Why do you want to work here
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what is the meaning of degreasing of the euipment or line.