what we execute firstly wall tile or floor tile?
Answer Posted / sachin
We firstly check FFL thiyyas of both flats or rooms and check right angle of room which we laid tiles, slab cleanses work, electrical pipe under the tiles mortar.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define What is the best type of wood glue?
What is the outturn of Ceiling plastering
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
what is pouring and explain
The foundations are placed below ground level, to increase?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
How long does it take concrete to harden?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
what is the construction cost for per cft of multistorryed building in kolkata?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how to calculate the size of triangular ring in rcc column?