using in R,Y& B PHASE LTSIDE(415V)ct ratio 4000/5 WITH
ENERGYMETR OF 1280 REV./KWH,240V.WHAT WILL BE MF OF METRE.

Answer Posted / govvinderaj gurram

The energy meter working on rev basis.If the energy meter
works on 5A input 240V 3phase the MF is 800.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//

1590


Is there any relevant technique to produce power from light and heat energy of the sun simultaneosly from same rays of light?

1415


how can see the ac indoor or out door ac which Tr

1560


The synchronous machine excitation system explain

1333


sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls

1786






Why MCCB is Getting tripped sometimes when there is no load in the Midnight ?

1399


what is EIB lighting control system? what is the advantages of this system?

3210


What is the use of Surge Capacitor in LAVT?

12914


Advantages of using generator circuit breaker (GCB) scheme in a power station ?

4748


Why is the frequency not changed during transformation of electrical energy in a transformer?

853


what happens when series resonance occurs?

1393


Draw the line diagram of diffretial relay connected to transformer?

1971


Testing report of Earthing of 3.15 MVa PTR.

2133


Safety of dry type transformer

1488


What is error of a measurement?

627