proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60,
m70, m75, m80 etc
Answer Posted / nitesh
m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
m30 and above is done by mix design
Is This Answer Correct ? | 18 Yes | 5 No |
Post New Answer View All Answers
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
what is that one cub metre plaster in cemant and fine sand
explain fie benefits of using standard terminology in the measurement process
how to disign cuplock shuttering and it's matireal requirement snd any related web site
Coverage of 25mm.thick ratio of 1:4 cement mortar?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
How to calculate brick work quantity?? Block work quantity??
what is tension footing?
Why is concrete cube test carried out?