proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60,
m70, m75, m80 etc

Answer Posted / nitesh

m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
m30 and above is done by mix design

Is This Answer Correct ?    18 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1924


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1470


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2103


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

918


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1878






How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1448


what is that one cub metre plaster in cemant and fine sand

1524


explain fie benefits of using standard terminology in the measurement process

1195


how to disign cuplock shuttering and it's matireal requirement snd any related web site

2523


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1410


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

2312


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1596


How to calculate brick work quantity?? Block work quantity??

2114


what is tension footing?

1543


Why is concrete cube test carried out?

777