buildings

Answer Posted / er gulzar ahmad

It is usually 40% of the total cost while using the normal
finishing items

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain moment of inertia?

649


how much of the strength comes from post-production curing

2268


What is meant by a context menu in a cad software?

687


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1988


What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil

2270






TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

1704


) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2254


How to plan a project

1722


What is the difference between routing maintenance and major maintenance in school facilities?

667


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1922


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1551


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1781


what is the minimum compressive strength of clay brick

1762


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1631


Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?

5613