Answer Posted / tamilmani
10
| Is This Answer Correct ? | 3 Yes | 13 No |
Post New Answer View All Answers
What is missing report and how to prepare
how to calculate valuation for the old building?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
dialation means
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
psc girder detail
What is the difference between routing maintenance and major maintenance in school facilities?
400 ku d/c clearess ketan hota hai?
How many Sft of Level Plaster per Kg
at which depth the construction of tunnel is economical from cost and engineering aspect.
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Which IS Code/American Code applied for coupler test of steel
it is a corrected question." make a list of engineering property(properties) of soil.
how much quantity of cement,sand and water required for 1 sq feet flooring work .