concrete coverings outside steel
Answer Posted / sachin sagar
Footing = 50 mm
Columns = 40 mm
Beam = 25 mm
Slab = 20 mm
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
When was the first motorway built in england?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
construction workers how much time take one work or qty
How to marking the building
how do you stabilize a waterlogged area in road construction
how much quantity of cement,sand and water required for 1 sq feet flooring work .
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
silt%= silt volume/ silt+sand volume is this right?
What was asked in isro civil interview
what is anchorage length,lap length and (dont remember the last one)
How to testing voids of filled aggregate in bitumen mix design
Explain what is the release of lien?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
why development length = 50D . why not 100D