Answer Posted / udhaykumar
minimum size of beam is 0.3*0.3m.
minimum size of coloumn is 0.23*0.23m.
Is This Answer Correct ? | 19 Yes | 6 No |
Post New Answer View All Answers
States some of the commonly used commands in cad software’s?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What are the different approaches in designing the floors of the service reservoirs?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is meant by Crystal Concrete?
How do you change a dimension value in solidsworks?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
roll of DLC in road constructions
can stub column take the load as main column
what is diffrence between catchment area,watershed and basin?
Formula of area of crane hook
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream