8mm steel not
available at site
used bar 8mm and
150cc please tell
me specing i used
10dia bar write
formula please
Answer Posted / ujjawal u daharwal (sgsits, in
very simple
Note: d1^2/s1 = d2^2/s2
where, d1= dia of available Bar
s1= spacing b/w available
d2= dia of new bar
s2= spacing of new bar
in this case; d1= 8mm, s1=150mm, d2= 10mm &s2= ?
8^2/150 = 10^2/s1
s1=234.375 mm c/c = 230 mm c/c ANS
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Who built the sears tower?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
how we calculate the vol.of wet concrete..?
can i get civil engineering test papers.......?????
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
door and window wood work calculations and different methods
In block work seawalls what is the purpose of slip joints?
Explain the different types of building contracts?
what is kribs is supporting?
what else we can add rather than admixture in concrete to reduce the cement quantity?
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
Name the main components of a cad gui?
How to calculate canal slope curvature qty!
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.