What are the methods to do a estimate.
Answer Posted / bethina sudheer
Detailed estimate & abstract estimate and an estimate can be prepared by any of two methods by using long& short wall method and centerline method
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
How to calculate canal slope curvature qty!
what is pouring and explain
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
how to calculate weight of 1.8 cum of aggregate
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
what is flexible and rigid footing?
is basic cost of the material includes tax?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
What things architect have to take care of before starting any project?
what is the difference between prime coat and tack coat in road construction
How many litres of water used for curing of 1000sqft of slav
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com