what is the allowable limit of wastage of cement for RMC at
plant operated manualy
Answer Posted / mighty sil
3.4 TO 5 % WASTAGE
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is structural frames or systems?
what is the design procedure for building
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
What is Joule Brayton Cycle?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Design a rectangular channel.
Spider cracks occur in beam bottom due to––
how statics is different from dynamics
Define What is Civil Engineering?
what is the productivity in aluminium shuttering per day
What is the usage of zoom command?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Describe the sections included in a typical bill of quantities