Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we calculate cutting length of a column ring
(300 x 600)

Answer Posted / sagar tiwari

For column cover is 40 mm both sides
here
300-40-40=220
600-40-40=520
For hook (10 times the dia meter of the bar)
so for 8mm = (80mm)
For bending (minus) 5X2d=5x2x8=80mm
Now the cutting length of the bar will be =
520+520+220+220+80+80-80
= 1560mm

ring size =220x520mm

Is This Answer Correct ?    313 Yes 64 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In cement concrete how to check a quality of material also proportion of material at site ?

1869


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2283


What is GSB gradation

2508


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1507


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

2018


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

2159


Which tests are performed on soil to decide the type of foundation to be provided.

2172


Describe Briefly The Various Methods Of Concrete Curing?

1115


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

2233


when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?

2168


how to absorb to site basic corrections? which are the important correction?

1499


How to testing voids of filled aggregate in bitumen mix design

1933


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2615


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

2421


What is c.g.i sheet which used for roof??

1946