Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How will you determine the capacity of a reservoir with help
of contur

Answer Posted / pranav panchal

You are right Vydehi, but can you describe me how can i
calculate the area of contour?

I think it can be calculated with the help of planimeter.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1729


what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?

1649


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

2409


How much time Required for PPR pipe network testing

2150


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2363


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2585


which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

2310


How much of the strength of concrete comes from post- production curing?

3214


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2235


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1506


how many type of admixtures for water stored structure?

2137


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1641


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2278


Prepare a Schedule for a Highrised building from starting stage to Handover?

1991


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

2072