Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

2. what is meant by exhausthood temp?

Answer Posted / ritesh patel

LOW PRESSURE TURBINE EXHAUST PRESSURE

Is This Answer Correct ?    4 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1714


By any way can we increase the B check hours from 300 to 500

2216


procedure of how to generate power in solar plant.

1964


What is LB-SR.

3028


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2426


How We Calibrate the vaccum transmitter?

1986


what is the difference between compensated & normal drum level in boiler drum?

1820


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2305


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1760


what is the basic use of power plant in equipment

1775


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1018


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1720


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3272


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2507


operation

1920