why bent up bars in slab provided in alternate manner and not continuos ?

Answer Posted / tatyasaheb gaikwad

Bending moment towards one and two direction its share
loads.this proses one way slab and two way slabs method.this
bent up length l/7.

Is This Answer Correct ?    8 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which are the top apps for you civil engineering?

686


How do you convert wind speed into force?

738


How do you prepare Material Recovery Statement for deduction from contractors bills?

1109


IS code for Rolling Margin of steel

1916


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2055






why we are useing plastic under the lean concrete?and whts the advantage?

2163


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

12703


Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting

1312


where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?

766


how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.

1506


Which type of plywood & sizes using in construction projects ?

656


strength vs shape factor

2132


what is the permanent solution applied for restoration of leaning tower of pisa?

3063


How is calculate the cube molt

1795


what is detail procedure of eccentric footing? plz. give solved exmple?

1838