Answer Posted / bharti
By the way your question is wrong.....There are plenty of IS codes ...And that's too branchwise soo you can't count them....
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What are the important hardware systems used for cad?
please send me bhel questions on rupesh.017@rediffmail.com
Which prize is the alternative to the NOVEL Prize?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
material used for mendrel use to bend epoxy coated rebar
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
What is the difference between one-way slab and two-way slab?
why do we provide haunches in rcc box or underpasses?
what is the price of a cubic meter of concrete on international market?
How to marking the building
I am called for interview from north east power plant .so, I need some interview question which may help me.