welding electrodes consumption per ton of structural steel
fabrication
Answer Posted / suresh
no one can answer this question.because electrode
consumption never depends its weight always depends upon its
connections line like bracings,gussets.
my simple answer is when the connections increases the
welding area also increases so the welding areas increases
the consumption of electrodes also increase.
Is This Answer Correct ? | 25 Yes | 14 No |
Post New Answer View All Answers
How is propeller fitted in shaft?
please let me know the book for preparing to section engi and loco pilot bangalore
What does thermal diffusivity of metals signify.
Explain how to clean LO
What are the defects in exhaust valve?
Name the operation which can be performed by lathe machine?
how many work softner filter ,multy media filter ,cartage filter , in r o system
Why tampering to be done?
Explain the importance of thermodynamics laws in mechanical engineering?
What should you do before you start the engine?
Re: what is different between run out and concentricity in Gd &T
mechanical question for the insrumentation
Please send me IOCL-GET-Mechanical Sample Question paper/previous year paper or the Guidelines related to the same...i will be very thankful to you. i m going to apper for the written of the IOCL on 6th July,2008 Thank you
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
How does turbine work?