Answer Posted / ankur shrivastav
According to IRC 21:2000, clause 304.6.2----
Development/Lap Length is depends upon various factor--
like-
1. Grade of Concrete
2. Grade of Steel
3. Bonding Zone
Lap Length will be- nx Dia
Value of n is as below-
M20 M25 M30 M35 M40 and above
Fe500 66 56 48 42 42
Fe415 55 46 40 35 35
Fe 240 65 60 55 50 50
These values belongs only for bonding zone-1*.
For Bonding zone 2- n=1.4 x value of "n" in bonding zone 1
* Bonding Zone 2- Bonding Zone 2 is a zone where bar has been bent less than 45 degree angle and more than 300 mm fresh concrete is casted below the bars.
All other locations are bonding zone 1
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
List out some of the checking’s, done at the completion of construction?
Explain what is zoning permit?
What is the difference between undo & redo?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How to fix toll charge for a particular vehicle at toll booths in a highway?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
plz.show development and anchorage length in simple diagram.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
what is the water-cement ratio of mix design while 30mpa in 7 days?
why development length = 50D . why not 100D
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is dead load impact load live load
How to calculate canal slope curvature qty!