Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the Safety measures in central chiller plant?
Explain them?

Answer Posted / kiran .j. anjutagi

1)Voltage variation.
2)High temperature.
3)Low temperature.
4)Oil temperature.
5)HP and LP switch.
6)condenser moter VFD.

Is This Answer Correct ?    21 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why magnetising curve not start with zero voltage?

2309


Why computer humming sound occurred in ht transmission line?

1149


A 500 V shunt motor runs at its normal speed of 250rpm when the armature current is 200A. The resistance of the armature is 0.12 Ω. Calculate the speed when a resistance is inserted in the field reducing the shunt field to 80% of normal value and the armature current is 100A.

2524


What is the difference between PLC and Embeded system

1454


In power transmission using open belts or horizontal shafts it is preferable to have the slack side of the belt on the top because

1239


difine electrical ballast in HPSVL

2099


Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

1990


From past few months I am getting lagging pf even though sufficient capacitors used in circuit. Where is the problem pls answer

1449


How to design the no. of ceiling fans required in 5mtr X 10 mtr X 3 Mtr hight room?

2168


What is the formula to find out two phase active & reactive power

2205


I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?

1982


Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A

3038


What is the use of bundle conductors?

1196


What is marx circuit?

1143


how test transfomer(3 phase75kva) by megger

2130