what we do if excavation is more than actual requirement
Answer Posted / raj
if excavation is more than the actual requirement , then we have to use filling upto the level which we have to originally excavate . the filling maybe sand filling or pcc filling
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Cement consumption of one cubic meter of aerocon blocks masonry?
what is idealized curve for concrere and steel
mean of NH4 pipe
What are wooden shingles?
Ratio for 4500 psi concrete
please briefly explain calculating or estimating steel quantity for a RCC column?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Define block?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
what is the productivity in aluminium shuttering per day
What out turn civil works
how many shuttering material required for 1000 sq.m built up area.
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is tension footing?