which purpose we are provide groove at sides
of door & window frames, columns & beams
Answer Posted / sagar tiwari
we are provide groove at sides of door & window frames,
columns & beams BECAUSE OF SHEAR FAILURE.Cracks may develop
at top of windows frames,columns and beams.Cracks do not
increase due to grooves.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What applicable rate of wct in bihar
Define relative co-ordinates?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How to design staircase.plz tell me formula for the design the staircase.
plumbing CPVC fitting FTE Brass full form
What do we mean by partial moment release ??
What is the significance of cost estimate knowledge for an architect?
use ofr concrete as per grade ?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m