what will happen if transmitter wire get
shoted?
Answer Posted / carl_ellis
Part I.
Let's assume the question involves a 2 wire, loop powered
transmitter powered by a 24Vdc power supply in series with
the transmitter and a load resistor across the analog input
of the receiver device.
The loop current is nominally 4-20mA.
The power supply negative is wired to the analog input
negative.
The short puts a positive 24Vdc on the (+) side of the
analog input.
The load resistor for the analog input is across the (+)
and (-) terminals, so the resistor now 'sees' 24Vdc across
its 250 ohms.
Part II. extra credit. Calculate the wattage spec needed
for a 250 ohm resistor to survive the short circuit in the
2 wire, loop powered cable.
Carl Ellis
Measure First
Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
hi! i want to know about mpse exam.
what is stroke check for field instument transmetter's & AOV's
How many interlocks at turbine side?
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?
Somebody tell me in what way i need to prepare for csio pgrpe(adv instrum eng)interview?what all the quest can i expect?
There are many type of control cable like pair,core,tried, What are defination each one
How to Calibrate Flammable gas detector in field
Why even multiple power supplu r used in instrumentation system?
Hi Friends i need Electronics&Instrumentation Engg question papers for BARC written test by coming 20th May 2008 pls post ur use full info to kkumarei@gmail.com. Or for suggestions pls give one missed call to 9962122264
in sulfur process what is material of impulse line we use to connect with transmitter ? and does teflon affected by sulfur?
In VVVF DRIVES VOLTAGE IS ALSO VARY WITH THE FREQUENCY. HOW? WHAT IS THE DIRECT FORMULA RELATING THESE TWO.
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What is hp & mp seperator .& what is its working principle ?
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
What is the working principle of the magnetic meter?