I HAVE 2 nO'S OF SYSTEMS, HOW MUCH UPS CAPACITY REQUIRED
ALONG WITH 400WATTS ANOTHER LOAD? PLEASE GIVE THE FORMULA?

Answer Posted / vijendra joglekar

1 phase : P = vi
3 phase : P = 1.7432 * vi

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are unstable systems?

658


What are the causes of unbalanced current on 34.5kv feeder Ia=0.05,Ib= 0.25, Ic=0.15 and In=0.27 prior to tripping current are balance?

1335


what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?

1762


which stabilizer is better ? AVR, Servo Stabilizer, Static stabilizer etc & why explain it

2418


give me applications of sequence bridges . (used in 3 phase un balanced systems)

1462






L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

676


describe the phenomena of vacuum interruption in C.B

1251


What is servo motor and what are the applications of servo motor?

2266


what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?

1460


What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker

1472


why zero sequence impedance measurement is not applicable for single phase GT

1704


WHAT IS MEANT BY DERATING OF THYRISTOR?

2471


How to do cable sizing calculation for 750 A Neutral Earthing resistor for 33kv. the 33kv cable going to swbd. is 630mm2 3 runs.

4325


list of tests to be carried out at manufacturers end while purchasing a step up transformer of 11kv to 66kv ,2MVa Capacity.

1562


sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

1754