Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is difference between limit state and working stress method? How it is applies in building structure.
Describe the sections included in a typical bill of quantities
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
what is the difference between np2 and np3 concrete mix
What is Critical path in Ms-Project ?
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is GSB gradation
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
how much of the strength comes from post-production curing
a butt weld is specified by
what is the water cement ratio for plastering