Answer Posted / samyak jain
The Water Cement ratio is
W/C=0.45 (IS 456-2000)
Now, Multiply the volume cement wth void ratio(30%).
W/Vc*1.3= 0.45
W= 0.585*Vc.
ANSWERE.
Is This Answer Correct ? | 2 Yes | 7 No |
Post New Answer View All Answers
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
HOw much % of premium on DSR-2013 currently
What is the Null Point of chimney in Power Plant
I have an span length 16 ft c/c
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
why +1 to be followed for calculating the no of bars in BBS. Please explain
Define What is rigging?
what could be the production cost of 1 cum of concrete by CP30 plant
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
Define the various stages of the project planning process in construction.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
which red: used in roof teping, then use only cement
In case if concrete box girder bridges how is the number of cells determined?