Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

is fan is a transducer or inverse transducer?

Answer Posted / lokesh

mainly transducer are those device which change one form of energy into another form with some physical change of its property. but in fan there is no chnge of its any physical quality. i mean no change in dimension, lenth or other things

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How we connect a instrument with ground, Give brief explanation with help of diagram?

2096


Tell about your IFFCO plant visit.

2083


Explain the working of rota meter.

1224


How do you identify an orifice in the pipeline?

1264


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2179


what is droop in governer ,type of droop ,how it work

2157


what is commisioning procedure,2)what is is the main work in commisioning in the field tx to dcs, plz send me detail

2308


Draw a complete P&ID of a flow suction tank indicating all control & protection equipment. Indicate all its inlets and outlets. Explain the controls for this system

1536


For crude application in floating roof tank, how to calibrate a DP Transmitter? How is the floating roof weight considered?

5464


what is Best Among SINK Or SOURCE Type Design In Digital Signal, Either Iput Or Output? WHY?Can any one..

2163


what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...

2013


What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?

2109


what is the difference between profibus and controlnet networking.

3229


explain key exchanges in all security modes WPA,WPA2,TLS?

2053


How process line mpm calculation is done?

1423