how much quantity of sand,cement,reqired for 100sqft of wall construction.
And how much quantity required for plastring
Answer Posted / ramadass
Required of cement : 33.48kg
required of sand :133.92kg
Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
dialation means
What is made from large rocks, which protects the base of cliffs?
how to design and calculate materail quantity for concrete speedbreaker ?
Moisture content calculation for diff mix ratio's ??
what is the meaning of 40/20 src
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is an ortho mode?
115mm thickness brick work how to required mortar
how to find quantity of concrete in PCC M15
Can we use the flyash bricks in brick bat coba?
What are the responsibilities of a site manager?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)