how much quantity of sand,cement,reqired for 100sqft of wall construction.
And how much quantity required for plastring

Answer Posted / ramadass

Required of cement : 33.48kg
required of sand :133.92kg

Is This Answer Correct ?    5 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

dialation means

1844


What is made from large rocks, which protects the base of cliffs?

745


how to design and calculate materail quantity for concrete speedbreaker ?

5382


Moisture content calculation for diff mix ratio's ??

1209


what is the meaning of 40/20 src

5767






how do you calaculate the total steel quantity of an rcc building using thumb rule?

3203


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

1748


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1831


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2390


What is an ortho mode?

726


115mm thickness brick work how to required mortar

1632


how to find quantity of concrete in PCC M15

1684


Can we use the flyash bricks in brick bat coba?

1076


What are the responsibilities of a site manager?

627


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1551