what is plum concreting and how is it can be done what is the
ratioo of rubble and concrete
Answer Posted / azam
40% - rubble
60% - concrete
Generally it's done in flat footing foundation by placing the rubble and concrete as mention above ratio without and gape between them.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
why we create short columns under grade slab?
For what building Built-on balconies are preferable? What are the advantages?
why does the most of civil engg is not intersted to going for teaching field?
Define What is a kip?
What do you mean by the word 'shear'?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What are the different types of civil engineering?
What are the important hardware systems used for cad?
sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????
what is raft foundation
what is SDLC ?and write a 'c'program for to swapping the three numbers?