what is plum concreting and how is it can be done what is the
ratioo of rubble and concrete

Answer Posted / azam

40% - rubble
60% - concrete
Generally it's done in flat footing foundation by placing the rubble and concrete as mention above ratio without and gape between them.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed

1914


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1461


why we create short columns under grade slab?

1843


For what building Built-on balconies are preferable? What are the advantages?

721


why does the most of civil engg is not intersted to going for teaching field?

1611






Define What is a kip?

725


What do you mean by the word 'shear'?

1841


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2772


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1642


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1379


What are the different types of civil engineering?

647


What are the important hardware systems used for cad?

676


sir i want to know that in L & T construction can we do our 6 months training proggramme cum placement???????

1763


what is raft foundation

1136


what is SDLC ?and write a 'c'program for to swapping the three numbers?

1393