1. why we use inverted beam ?
2.why we use extra bar in beam ?
3.dimension in L-bar in column ,footing and beam
Answer Posted / umesh gumme
We use inverted beam in that moment the distanjce b/w ceiling and flooring comes less...
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Please design 12.5m long dubbly beam
How is the strength of cement measured?
Basic questions of civil engineering
What is the strength of 1:6:12 mix?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
How we calculate the service time of buildings
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
what are the duties of Site Engineer in work site?
What is Rankine Cycle?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
How do we calculate the power of centrifugal pump?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the weight of 12mm aggregates?