Which Programming software are use for Allen bradley PLC's?
Answer Posted / abc
RSlogix5,500 and 5000.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to find number of run cable laying[LT side] for transformer & alternator secondary side? [above condition for getting output power transformer to main panel side] give the example.
Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?
HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?
How to size fuse? How to size MCB?
Why is a synchronous motor always star connected??
how many types are their in switchyard or substation(like D,I TYPE), what is differant between them
What is meant by derating factor?
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
Type of motor stater detail and working detail
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
what is magnetizing and demagnetizing current in generator and motor?
How to calculate no of EARTH PIT? Describe the formula as per IS standard?
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?