Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can we run three phase motor by single phase? and what
happens if we do this

Answer Posted / brd ganesh

S we CAN a single phase supply can not produce
rotating magnetic field BUT it produce alternative
magnetic field. It can start with low starting
torque if we give prime move(starting means) to
that motor

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the working process of over & under voltage relay.

2246


why do we carry out winding resistance test?

2302


A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.

2605


power transmission pole used one support , that only for support or earthing

1969


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1810


What is sensitivity of a measurement?

1150


why starting current is high and resistance is almost 0 during the starting of motor dc motor...?

1747


limitation of conductor height on ground when we consider EMC

2065


What is an 86-P or an 86-A trip

2085


2- What are the percentages between excitation currents in phase (R, S and T) in ∆ and Ỵ connections in excitation Current test in transformers?

2022


why the carbon brushes are broken in srim while the motor runningtime

1729


how many load we can take for lighting

2296


What are the specifications for getting approval of Substation?

1954


how braking & making capacity of circuit breaker are calculated?

2314


what is parellel power factor correction?

4423