Answer Posted / bharath m,+91 8438238335/99806
Not more than 6%
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Why should appointment store person for project ? what is the benefits for company ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
who to find building iron rod strenth
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
how to calculate the strength of rebound hammer test reading in building construction ?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What is the release of lien?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
Sir how to find cutting length for footing steel bars in the shape of "u"