How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.
Answer Posted / baldeo m. sarwe
Yes this formula is near abovet is correct
Is This Answer Correct ? | 27 Yes | 10 No |
Post New Answer View All Answers
types of laps in column
Which percentage of carpet area use in plot area of office building.
what is shuttering co efficient?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
How to find out slope footing concrete
Aptitude, reasoning, quants, verbal and technical question
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Define Who designed the city of Washington DC?
How can you produce desired alloys and discuss their applications in daily life.
what"s the sort of beams?
What is passive earth pressure ?
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What is the usage of zoom command?
what pressure the NP2 class RCC pipe can sustain?