How to calculate the amount of cement & sand required for
plastering work with ratio 1:4 please give me an answer with
detailed step.

Answer Posted / baldeo m. sarwe

Yes this formula is near abovet is correct

Is This Answer Correct ?    27 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

types of laps in column

1913


Which percentage of carpet area use in plot area of office building.

1392


what is shuttering co efficient?

1301


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

1494


How to find out slope footing concrete

2429






Aptitude, reasoning, quants, verbal and technical question

989


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2099


Define Who designed the city of Washington DC?

635


How can you produce desired alloys and discuss their applications in daily life.

674


what"s the sort of beams?

1817


What is passive earth pressure ?

718


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1973


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1366


What is the usage of zoom command?

686


what pressure the NP2 class RCC pipe can sustain?

2212