What is megering????

Answer Posted / ifo

Megger is a name of a manufacturer that produce Test
Equipment.

However , some persons wrongly use the word megering to
mean "Cable Insulation Resistance Test" .

Moreso, Megger produces Test Equipment for testing
Continuity, Insulation Resistance, Earthing Loop
Impedance/Resistance, and so on.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can please tell mi about SIOS, PRM, SERVER, and what is the diference between PIN LAN, PCS LAN,APC Server, and please send the Doc if possible for referance,mail id patil_amit17@yahoo.com

1447


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

1693


1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC

2075


Describe a time when you anticipated potential problems and developed preventive measures.

2484


How does your previous experience relate to the job you are applying for ?

1558






Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions? 

1719


plz send me general of ongc

1540


Derive capacitance to 4-20ma conversion formula / relation in capacitance type pressure sensor?

1769


Specify for Cables - Flame Retardant and Fire Resistant?

1633


how to work static pressure sensore how to work dpt

1407


How addressable fire systems work? Pl. send details with architect.(Loop), also send details regarding Gas system. Pl. help me.Thanks

1641


what is the difference between active & reactive power?

1670


Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.

1491


installation process of orifice,a question asked for confusion creation in interview by BARC 1.if orifice is tightly fitted with pipe ,it will act like venturi 2.if orifice is left hanging in between liquid it will not create the pressure difference exactly,

1671


1.what is the power consumption of three element drum level control in sugar industries? 2.how to reduce that?

1193