Key is put at the time of casting 1st lift of column to get–
–
Answer Posted / sjtbehera
It gives a bond strength to 1st lift and 2nd lift column
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is meant by cad?
brickwork labour rate per cum ?
How to calculate carrying capacity of the existing water supply trunkmain
residential buildings,mixing of concrete,structural,construction material,site handling.
How to design staircase.plz tell me formula for the design the staircase.
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Describe the sections included in a typical bill of quantities
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What is progress payment?
how many BSCs can i connect to the HUAWEI MSC
what is m30 in concrete tiles
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
What is geopolymer based concrete?
How to calculate brick work quantity?? Block work quantity??
why we use aggregate,sand with cement in concrete?