Key is put at the time of casting 1st lift of column to get–

Answer Posted / sjtbehera

It gives a bond strength to 1st lift and 2nd lift column

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is meant by cad?

655


brickwork labour rate per cum ?

1115


How to calculate carrying capacity of the existing water supply trunkmain

1811


residential buildings,mixing of concrete,structural,construction material,site handling.

2022


How to design staircase.plz tell me formula for the design the staircase.

1409






20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

1897


Describe the sections included in a typical bill of quantities

1794


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1822


What is progress payment?

714


how many BSCs can i connect to the HUAWEI MSC

1842


what is m30 in concrete tiles

1898


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1501


What is geopolymer based concrete?

2158


How to calculate brick work quantity?? Block work quantity??

2115


why we use aggregate,sand with cement in concrete?

8138