Answer Posted / chenny
why we want to go for uneconomical beam section by providing this much of big span and uneconomical quantity of concrete required for a small 15000L water tank.
by this we can save much higher floor area.
we need to use only 6.25m2
simply we can provide an economical dimension
2.5x2.5x2.5m
length of tank=2.5m
breadth=2.5m
height of tank=2.4+(0.1m as dry board)
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Wats the formula of eccentric footing and how was calculated from concrete qty
How to design staircase.plz tell me formula for the design the staircase.
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What was asked in isro civil interview
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
What is meant by cartesian coordinate system?
how to clculate the %of concrete strenght achive after curing?load
Calculation of Pier Cap with tapper area?
Advantage of Aluminum form work in terms of activities can be skip and cost too
what radial pressure, the NP2 class rcc pipe can sustain?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
what is mean by reestimation?