The designs required to construct a building are ––
Answer Posted / sjtbehera
Go through book because it is a long process
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What is different between DI Pipe and CI pipe?
What is the absolute pressure scale?
What is the difference between yeild strength and compressive strength of steel???
What is the meaning of soil reinforcement?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how much required strength of cement concrete bricks(size 230x115x75mm)
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
what do you understand by M25 concrete
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
how much cement sand n bricks required in im3?and how much in plaster?
brickwork labour rate per cum ?