Answer Posted / shalender kumar
10% silt is allowable.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Minimum concrete cover in slabs, columns, beams, foundation and other st?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Civil engineering related
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
What are the uses of layer?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How to check slab shuttering level.? Or check list for slab ?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
why development length = 50D . why not 100D
psc girder detail
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
trapozidal
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed