what is the meaning for 'prime cost' in civil construction
contracts?
Answer Posted / prashant
it is a single fixed price contract in which contractor
agrees to perform specified job for fixed sum.
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what is column foundation
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
can i get civil engineering test papers.......?????
What things you need to take care of before building a kitchen island?
What are the advantages of cad?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
can any one explain bar bending schedule of bems and columns and slabs ??
Stringer How many cm goes to landind
How much material will consume for following specification water tank (9*7.5*6 feet)?
What is the Maximum %age of Steel in columns and beams ?
how we can find sieve #4 is 4.75mm?
Why are the bolts that hold steel rails together in oval holes?
what is flexible and rigid footing?