As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?

Answer Posted / naveed

first of all problem root cause need to be identified and people responsible should be penalized .then rectification options should be be enlisted and effective way need to be adopted for correction..

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1962


important question on stones

1514


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

1540


What are the advantages and disadvantages of lead products in construction?

735


Will going from a 3-tap to 6-tap increase water pressure?

649






Is there the dry coefficient of cement is constant?

1828


What is meant by a context menu in a cad software?

676


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2005


What is the worlds largest concrete dam?

711


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1101


4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils

2299


plumbing CPVC fitting FTE Brass full form

2130


Which is the direction for positive angle?

719


How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?

1571


sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.

1490