As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / naveed
first of all problem root cause need to be identified and people responsible should be penalized .then rectification options should be be enlisted and effective way need to be adopted for correction..
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
important question on stones
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
What are the advantages and disadvantages of lead products in construction?
Will going from a 3-tap to 6-tap increase water pressure?
Is there the dry coefficient of cement is constant?
What is meant by a context menu in a cad software?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What is the worlds largest concrete dam?
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
plumbing CPVC fitting FTE Brass full form
Which is the direction for positive angle?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.