Answer Posted / rajah

As per IS 7 days is not required but 7 days result is just a cross checking (7 days result must more than 77%)

for 28 days
concrete in cmt no of samples(3 cubes)
1) 1 to 5 1
2) 6 to 15 2
3) 16 to 30 3
4) 31 to 50 4
5) 51 and above 4 plus one additional sample for
each additional 50 cmt

Is This Answer Correct ?    23 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the ingredient value of 40mm and 20mm aggregates?

1557


how to identify np3 pipe and np4 pipe

1531


how to clculate the %of concrete strenght achive after curing?load

1935


can i get hindi version of is codes based on civil engineering?

3884


How many Sft of Level Plaster per Kg

1123






"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.

1623


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

1670


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2182


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2392


What is horizon or horizontal mining?

643


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

2046


What do you mean by tolerance factor of concrete ?

2671


For the construction project what capital cost has to be taken in consideration?

676


What is bmc stands for in bmc software?

669


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

1877