Do you know differenence between design mix and nominal
mix?
Answer Posted / tarun johri
Nominal mixes are those proportioned by the volume of the main ingredients and usually written in order of the ingredients thus Cement:Sand: Coarse aggregate (stone, chippings). So a 1:3:6 is a nominal mix containing 1 volume of cement, 3 volumes of sand and 6 volumes of coarse aggregate.
Gauge boxes are generally used to batch the ingredients. The problem with these types of mixes is that the quality of the concrete is entirely dependant on the quality of the materials. In other words, if you use the same gauge boxes to weigh ingredients from different sources, you will most likely have different concrete qualities.
Designed mixes on the other hand are specified as a grade the producer of the concrete has to achieve usually in terms of compressive strength but may include other criteria (size of the stone, minimum amount of cement, flexural strength, air content etc). So a grade 30 concrete
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Civil engineering related
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
What is an object snap mode?
water leak detection system question & answer
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What are the strongest shapes in building?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
what is project?
what is polity
What is the likely strength of a 1:2:4 concrete mix?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the advantages of building a dam on the river nile?
What are your future hopes for this job?
how many spacers we need for 1 ton reinforcement? aprox.