How to calculate numbers of carpenter, fitter, mason, unskilled worker on
the basis of built up area or floor plat area of building?

Answer Posted / prasanth

work done/per day

Is This Answer Correct ?    3 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?

1570


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

978


How do you calculate load bearing capacity of a waffle slab?

2214


What will you do if a portion of load bearing wall collapses under your supervision?

1525


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1644






 What is difference between limit state and working stress method? How it is applies in building structure.

1770


What is labor and material payment bond?

636


what is the mode of method of face bar measurement

2062


Explain what is change order request?

683


Define What is the tensile strength of wood?

676


Civil engineering material testing Standard results

1870


what is the criteria for the finalisation of pavement thickness in road project?

1591


Can inverted beams used in pipes during construction?

870


what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1900


how to shuttering is used in slab

1322