As per thumb rule cement required per 1 cum of M20 concrete
is 411Kg/cum(1.57/5.5=0.285cum of cement i.e
0.285*1440=411Kg).But as per PWD rate analysis cement
required is 347Kg/cum.the difference is 64Kg.This kind of
difference is coming every grade of concrete.Can you give
perfect suggestion regarding this.
Answer Posted / pranav panchal
This difference comes due to the mix design of the concrete
At every place the mix design depends upon the material & material source so if PWD is considering the cement consumption that means their mix design shows this cement consumption
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Why should appointment store person for project ? what is the benefits for company ?
what is a well
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
What is the zero value in quantity surveying
How high should the water tank be to provide a 60 psi at base of this water tower?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
In reclamation works what are the importance of geotextiles and sand?
Civil engineering material testing Standard results
What is the likely strength of a 1:2:4 concrete mix?
what is the tensile strength of 10swg and 8swg gabion wire?
Describe Briefly The Various Methods Of Concrete Curing?
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2