Answer Posted / ronak shah
cement containt lime part in it. so there is hydration
process take place, heat is generated to control the heat
of hydration, make the surface wet.
Is This Answer Correct ? | 26 Yes | 2 No |
Post New Answer View All Answers
how to shuttering is used in slab
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
why we use 19x9x9and 20x10x10 but not other
what is the relation between pitch of steel and depth of slab?
Soil bearing capacity formula
what is work of planning deptt. in any construction compny (in road project)
in the earthquqke the profile of water on dam is parabolic or not
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
how to calculate the size of triangular ring in rcc column?
i need gate exam civil engineering question papers with answers
What are the responsibilities of a construction manager?
What is packing Factor ?
how gradation of aggregates effect on slump of fresh concrete?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?