Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we are using coarse sand for brick work and is there any
technical problem if, we use fine sand instead of coarse sand.

Answer Posted / ayush agarwal

water requirement of per unit surface area will be less in
coarse sand in compare to fine sand hence less will be
workability and more will be strength

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to identify np3 pipe and np4 pipe

2068


How to find out slope footing concrete

2952


Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..

2882


why building got air crack? if it get in one particular are what is means?

2468


How is make concrete cube?

1210


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

4298


pls tell me , what is the water content

2234


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2868


How to increase a bearing capacity of soil?

1145


"Gates of the dams are generally designed of curved shape". Why?

2068


Rate analysis of Vitrified tile in cement mortor 1:3

4494


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

2420


what is pile and deam foundation

2353


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2274


what is thumb rule for calculating the size of ISMB required for a particular length of span

3459