Why we are using coarse sand for brick work and is there any
technical problem if, we use fine sand instead of coarse sand.
Answer Posted / guest
course sand is not suitable for brick work
| Is This Answer Correct ? | 5 Yes | 15 No |
Post New Answer View All Answers
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the strongest bridge for a school contest?
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
how calucate cement sand ratio for plstering
What is rate of concrete surface rendering work per sqm
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Discuss some applications of modular elasticity?
What is the compressive strength of fly ash bricks?
What is need for setting limits?
How much cum. Brick work can do by 1 madon
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to arrive d*d/162 , for finding the kg per meter , wt of steel